It is a one step application which reduces labor time.
Gaco roof dry time.
One 5 gallon pail covers 250 square feet of roof with 2 coats.
Gacopatch is now available in both a 2 gallon pail and a sausage tube.
Gacoroof is available in several colors to enhance the aesthetics of any roof.
Updates to the tax cuts and job act for 2019.
While bleedtrap will exhibit early rain resistance in as little as 30 minutes it should be allowed to thoroughly dry prior to application of primer or top coat.
Allow a minimum of 12 hours before applying top coat.
Gacoroof 100 silicone roof coating creates a seamless membrane to seal and repair existing roofs and permanently protect against leaks permanent ponding water and the damaging effects of severe weather.
Clean up maintenance.
Gaco is a best in class provider of silicone roof coating systems waterproofing and insulation solutions for commercial and residential buildings.
Gacoflex bleedtrap is a single component easy to apply water based sealer for use on asphalt roofing substrates containing bitumen including built up roofing bur all types of modbit and smooth or granulated asphaltic roofing membranes.
Coat within 48 hours.
Ideal for use on flat and sloped roofs including but not limited.
Allow the first coat to dry a minimum of 3 12 hours or until it can be walked on before coating with gacoroof 100 silicone roof coating product is moisture cure low humidity will result in longer dry times.
Final coat should be allowed to cure 24 to 48 hours depending on temperature and humidity before suitable for light foot traffic.
22 dry mils applying temperature.
It was developed to encapsulate the oil that commonly exudes from asphalt substrates and effectively traps it within the sealer to inhibit bleed through.
Eliminates the need for primer on most substrates compared to previous generation gacoflex silicone coatings.
Allow 1st coat to dry thoroughly between 3 12 hours depending on climate before applying the 2nd coat.
Do not apply in temperatures below freezing above 120 f 49 c or if rain is expected within 2 hours.
Application of top coats.
Three years from date of manufacture when stored in unopened containers between 40 85 f 4 29 c.
Allow 1st coat to dry thoroughly between 3 12 hours depending on climate before applying the 2nd coat.
Do not apply in temperatures below freezing above 120 f 49 c or if rain is expected within 2 hours.